How Long Does a Roof Replacement Take? What Homeowners Should Expect

Residential Roof Replacement: Installed Standard Weight Eagle "M" Tiles
Discover how long a roof replacement normally takes and the factors that affect your roof replacement timeline.

When your roof starts showing signs of wear—or worse, leaks—it’s time to consider a roof replacement. For homeowners in Northern San Diego County, where the climate can be both sunny and severe, having a strong, reliable roof is essential. One of the most common questions we hear at Schott Roofing is: How long does a roof replacement take?” The answer? It depends on a few key factors—but we’re here to guide you every step of the way.

Whether you’re worried about timing, the mess, or how to prepare your home, this post breaks down the entire roof replacement process. You’ll learn what to expect from inspection to final shingle, what influences the timeline, and how you can prepare for a smooth experience.


What Is Roof Replacement?

Let’s start with the basics. A roof replacement involves removing all the existing roofing materials—shingles, underlayment, flashing—and installing a brand new roofing system. This is different from a simple repair or overlay and ensures your home is protected for decades to come.

If your home is 15–20 years old or more, it’s likely your roof is reaching the end of its functional life. Signs like curled shingles, frequent leaks, or missing tiles mean it’s time to think about replacing.


How Long Does a Roof Replacement Take?

Typical Timeline: 5–10 Working Days

While some roofing companies may promise a quick turnaround, we believe in doing it right the first time. At Schott Roofing, most average-sized residential roof replacement projects in Northern San Diego County take 5 to 10 working days, depending on:

  • The size and complexity of your roof
  • Weather conditions
  • Material selection (e.g., tile takes longer than shingles)
  • Any unexpected repairs, like rotted or damaged wood


We also factor in city inspections and HOA requirements, ensuring everything is up to code.


Factors That Affect Your Roof Replacement Timeline

1. Size and Complexity of Your Roof

Larger homes or homes with steep slopes, multiple levels, or unique architectural features take longer. A basic, single-story 1,500-square-foot home may be completed in less time than a larger or more complex roof.

2. Weather Conditions

San Diego’s weather is generally favorable for roofing, but high winds or unexpected rain can delay a project. At Schott Roofing, we always monitor forecasts to plan accordingly, minimizing delays while keeping your home protected.

3. Type of Roofing Material
  • Asphalt shingles: Typically faster to install
  • Tile roofing: More labor-intensive, requires careful placement
  • Metal roofing: Medium duration with high durability
  • Composite Roofing: Not as fast to install as asphalt shingles, but very durable


We’ll help you select the best material for your home and budget, and let you know how it impacts your schedule.

4. Permit and Inspection Requirements

Northern San Diego County cities typically require permits and inspections for a roof replacement. We handle all of this for you—it’s part of our commitment to a stress-free experience. Just know that scheduling city inspections can occasionally cause short delays, depending on availability.

5. Unexpected Structural Repairs

Sometimes, once we remove the old roof, we discover issues with the decking (the wood beneath the shingles), flashing, or ventilation that must be addressed before installing the new system. We’ll always be transparent about what we find and how it affects the timeline.


The Roof Replacement Process: Step-by-Step

Here’s what you can expect when you choose Schott Roofing:

1. Initial Estimate

We start with a free, honest estimate for your roof. We’ll assess the condition, recommend materials, and give you a detailed written estimate—no pressure, no upselling.

2. Choosing Your Materials

We’ll walk you through the pros and cons of each roofing option, from asphalt shingles to tile, metal, or composites. We’ll help you select the best match for your home’s style, energy efficiency needs, and budget.

3. Permitting and Scheduling

Once you’ve signed off, we handle all necessary permits and schedule your project at a convenient time. You’ll receive a clear timeline so you know exactly what to expect.

4. Roof Removal (Tear-Off)

On installation day, our crew arrives early and begins carefully removing your old roof, section by section. We protect your landscaping, windows, and driveways with tarps and plywood shielding.

5. Inspection and Repairs

We inspect the decking and framing for any hidden damage. If repairs are needed, we’ll explain why and take care of them before proceeding.

6. Installation of New Roofing System

This includes laying down waterproof underlayment, flashing, ventilation components, and the new roofing material. We follow manufacturer specifications and best practices to ensure lasting performance.

7. Final Cleanup and Walkthrough

We do a full magnetic sweep for nails, clear all debris, and walk you through the completed job. Your satisfaction is our priority.


Expert Tips for a Smooth Roof Replacement Experience

Roof replacement doesn’t have to be stressful. Here are some expert tips from our decades of experience working on homes across San Diego:

✅ Prepare Your Yard

Move patio furniture, potted plants, or vehicles away from your home. This gives our crew clear access and protects your belongings.

✅ Inform Your Neighbors

Roofing can be noisy. A friendly heads-up helps maintain good relationships with your neighbors.

✅ Secure Fragile Items Inside

Vibrations from roofing can affect items on your walls or shelves. Consider removing anything delicate just in case.

✅ Plan for Children and Pets

It may be best to keep children and pets indoors or at a relative’s home during active work hours.


Why Choose Schott Roofing for Your Roof Replacement?

For over 55 years, Schott Roofing has been the trusted name in San Diego County for high-quality, affordable, and timely roof replacement. We’re not just roofers—we’re part of the community. Our team is licensed, insured, and experienced with all roofing types found in Southern California.

We pride ourselves on doing the job right the first time—with clear communication, honest pricing, and exceptional craftsmanship.

Here’s what sets us apart:

  • Trusted locally for over 55 years
  • Fully licensed and insured
  • Experienced with all major roofing systems
  • Responsive, respectful crews
  • Detailed, honest estimates with no hidden fees


So, How Long Will Your Roof Replacement Take?

In most cases, just a few days. But more importantly, we make sure it’s done right—with attention to detail, clear communication, and a crew you can trust.

If your roof is 15 to 20 years old, don’t wait for leaks to tell you it’s time. Schedule your free estimate today and let Schott Roofing guide you through the process from start to finish.


Ready to Start Your Roof Replacement?

Replacing your roof might seem like a big project—but with the right team, it doesn’t have to be overwhelming. From inspection to installation, Schott Roofing is here to help you protect your home, stay on budget, and enjoy peace of mind for years to come.

Contact us today to schedule your free estimate and see why homeowners across Northern San Diego County trust Schott Roofing for expert roof replacement.